Scheduling the block painting process in shipbuilding with group completion constraints

문서 유형
연구출판물 · 학술지 논문
등재
KCISCIEScopus
저널 순위
JCR Q1Scopus Q1KCI Q1
피인용
Web of Science 0Scopus 0KCI 0
FWCI (Scopus)
0
JCR IF
JCR 2024 3.9
ISSN
2092-6782

저자

  1. 신영식제1저자Pusan Natl Univ, Dept Ind Engn, Major Ind Data Sci & Engn, Busan, South Korea
  2. Lee, Dong-NyeongHanwha Ocean, DT Solut R&D Team, Geoje Si, Gyeongsangnam D, South Korea
  3. Jeong, Yoon-Jea교신저자Pukyong Natl Univ, Div Syst Management & Safety Engn, Busan, South Korea
  4. 한준희교신저자Pusan Natl Univ, Dept Ind Engn, Busan, South Korea

초록

This study addresses a block-scheduling problem in shipyard painting processes by incorporating detour-path constraints and group completion-time requirements. A truncated branch-and-bound (B&B) algorithm guided by simulated annealing (SA) is proposed. In the methodology, SA is first used to rapidly identify a high-quality initial solution, which is then refined through the B&B procedure. The performance of the proposed algorithm is evaluated by comparing its solution quality and computation time with those obtained from a MILP model. Furthermore, a case study based on a Korean shipyard is conducted to validate the robustness of the algorithm. By incorporating practical operational factors observed in real shipyards, this study provides a foundation for developing automated scheduling systems for shipyard painting operations.

키워드

SchedulingShipbuildingSimulated annealingBranch and boundGroup completion time