자원배분 전략에 따른 국방핵심기술 과제 협약일정에 미치는 영향 분석

Analysis of the Impact of Resource Allocation Strategy on the Scheduling of Core Defense Technology Project Agreements

문서 유형
연구출판물 · 학술지 논문
등재
KCI
저널 순위
KCI Q3
저널
한국산업경영시스템학회지47(3) · pp.8 · 2024
피인용
KCI 0
ISSN
2005-0461

저자

  1. 김장은제1저자국방기술진흥연구소 / 부산대학교 산업공학과
  2. 정의영국방기술진흥연구소
  3. 홍순도교신저자부산대학교 산업공학과

초록

There is a demand for introducing a challenging and innovative R&D system to develop new technologies to generate weapon system requirements. Despite the increasing trend in annual core technology development tasks, the infrastructure expansion, includ- ing personnel in research management institutions, is relatively insufficient. This situation continuously exposes difficulties in task planning, selection, execution, and management. Therefore, there is a pressing need for strategies to initiate timely research and development and enhance budget execution efficiency through the streamlining of task agreement schedules. In this study, we propose a strategic model utilizing a flexible workforce model, considering constraints and optimizing workload distribution through resource allocation to minimize bottlenecks for efficient task agreement schedules. Comparative analysis with the existing operational environment confirms that the proposed model can handle an average of 67 more core technology development tasks within the agreement period compared to the baseline. In addition, the risk management analysis, which considered the probabilistic uncertainty of the fluctuating number of core technology research and development projects, confirmed that up to115 core technology development can be contracted within the year under risk avoidance.

키워드

RCPSPMILPDefense Technology PlanningCore Technology DevelopmentProject Management