Current and future prospects of small hydro power in Pakistan: A survey
- 문서 유형
- 연구출판물 · 리뷰논문
- 등재
- SCIEScopus
- 저널 순위
- JCR Q3Scopus Q2
- 저널
- ENERGY STRATEGY REVIEWS24 · pp.166 · 2019
- 피인용
- Web of Science 48Scopus 61
- FWCI (Scopus)
- 0.34
- JCR IF
- JCR 2018 2.633
- ISSN
- 2211-467X
저자
- 우딘 와카르제1저자교신저자School of Electrical Engineering, Pusan National University Busan, South Korea
- AyeshaDepartment of Electrical Engineering, University of Management & Technology Lahore, Sialkot Campus, Pakistan
- 젭 캄란School of Electrical Engineering, Pusan National University Busan, South Korea
- Haider, AunDepartment of Electrical Engineering, University of Management & Technology Lahore, Sialkot Campus, Pakistan
- Khan, BilalDepartment of Electrical Engineering, COMSATS University Abbottabad Campus, Pakistan
- 이슬람 사이프 울School of Electrical Engineering, Pusan National University Busan, South Korea
- 이스파크 무함마드School of Electrical Engineering, Pusan National University Busan, South Korea
- 칸 임레인School of Electrical Engineering, Pusan National University Busan, South Korea
- Adil, M.Department of Electrical Engineering, Air University Islamabad, Pakistan
- 김희제School of Electrical Engineering, Pusan National University Busan, South Korea
초록
Currently, the electrical energy crisis is an important issue in Pakistan. Due to the shortage of electrical power, inhabitants of the country are facing 10-12 h of blackouts in urban areas and 14-20 h in rural areas daily. The current demand for electrical power is 15,000 MW, which is expected to increase further to 49,078 MW by 2050. Conventional energy sources are unable to meet this demand. This paper discusses the potential of Small Hydro Power Plants (SHPPs) to partially overcome the shortage of electricity. Overall, 60,000 MW of hydroelectric resources have been identified in Pakistan. whereas, approximately 11% of the identified resources are operational, producing 7228 MW of electric power. The energy crisis can be easily overcome by installing SHPPs. The use of SHPPs has been estimated to save 120 million tons of coal or 83.3 billion liters of oil in a year. Thus, these plants are environmentally friendly and make a low contribution to global warming. Worldwide, SHPPs provide employment to 0.2 million people. Pakistan Council of Renewable Energy Technology (PCRET) and Sarhad Rural Support Program (SRSP) has installed 1100 SHPPs, with a total capacity of 42.507 MW, which fulfills the electrical energy demand of approximately 0.7 million people in Pakistan.
키워드
RENEWABLE ENERGYMICRO-HYDROPOWERMINI-HYDROGENERATIONPLANTSTECHNOLOGIESPERFORMANCEMALAYSIASYSTEMISSUES
식별자
- Scopus EID
- 2-s2.0-85062847319
- WoS UID
- 000466911300013



로그인
연구물 목록으로