Productivity analysis of steel works for cost estimation of public projects in Korea

문서 유형
연구출판물 · 학술지 논문
등재
KCISCIEScopus
저널 순위
JCR Q4Scopus Q3
저널
KSCE JOURNAL OF CIVIL ENGINEERING16(1) · pp.1 · 2012
피인용
Web of Science 4KCI 0
JCR IF
JCR 2011 0.377
ISSN
1226-7988

저자

  1. 윤석헌경상대학교
  2. 태용호고려대학교
  3. 안방렬한국건설기술연구원
  4. 안성훈한국건설기술연구원
  5. 허영기교신저자부산대학교
  6. 조훈희Korea University

초록

The steel fabrication and installation works in a steel-structured building project account for 20% of the entire construction cost. In estimating construction costs, a few parameters are more significant than work item productivity. However, the Standardized Productivity (SP) of steel works presented in Poom-Sam, which is the standardized estimating guide system used in the public sector in Korea, has rarely been updated since its establishment in the 1970s. In order to update and improve its structure and figures, 15 construction sites and 5 steel fabrication shops were visited over a period of two years. From the study, it was found that the structure of Poom-Sam was rather complex and outdated and that the average SP of the works analyzed from the research was approximately 85% of the current SP. Moreover, the effect of the productivity differences on total construction cost was approximately 10%. The productivity improvements and amended Work Breakdown Structure (WBS) are attributable to the technology advancements in equipment and construction methods over the past two decades. The results of this study will improve the reliability and accuracy of cost estimation in steel works.

키워드

steel worksproductivity analysiscost estimationstandardized productivityLABOR PRODUCTIVITY