Improving Sustainable Project Success Strategies Focused on Cost and Schedule for Electrical Construction Project Management
- Document Type
- Publications · Journal Article
- Registered DB
- SCIEScopusSSCI
- Journal Ranking
- JCR Q2Scopus Q1
- Journal
- SUSTAINABILITY14(5) · 2022
- Citation
- Web of Science 5Scopus 9
- FWCI (Scopus)
- 0.5
- JCR IF
- JCR 2021 3.889
- ISSN
- 2071-1050
Authors
- Kim, JanghwanFirst authorKangwon Natl Univ, Dept Civil Engn, Samcheok Si 25913, South Korea
- Lim, JeeyoungPusan Natl Univ, Dept Architectural Engn, Busan 46241, South Korea
- Lim, Hyoung-ChulChangwon Natl Univ, Dept Architectural Engn, Changwon Si 51140, South Korea
- Kim, DaeyoungCorresponding authorPusan Natl Univ, Dept Architectural Engn, Busan 46241, South Korea
Abstract
© 2022 by the authors. Licensee MDPI, Basel, Switzerland.Electrical contractors encounter problems such as limited construction sites, schedule interference, and inefficient communication with other contractors when they typically subcontract with general contractors. Electrical projects require effective and systematic project management strategies to overcome these problems and achieve the desired goal. In an electrical construction project, individual tasks are interconnected at different stages, including pre-construction planning (PCP) and project execution (PE). Therefore, analyzing the effect of task strings on the project success in terms of schedule and cost performance is necessary. The main objective of this study is to perform a static analysis to compare successful and failed projects with a focus on the cost and schedule performances, using the PCP and PE task strings in electrical construction projects. To achieve this, a continuous PCP-PE task strings implementation score was calculated for each PE group in terms of cost and schedule, and successful and failed projects on unweighted and weighted values were compared and analyzed by performing an independent sample t-test. Consequently, it was confirmed that the use of most task strings had a positive effect on the cost success at a confidence level of 95%, and that only the subcontractor management group had a positive effect on the schedule success. Hence, it was derived that the usage of task strings for these groups is recommended for cost success in electrical construction, and continuous PCP-PE task strings do not have a positive effect on schedule success; therefore, it is recommended to use the PCP-PE task strings only for specific groups for schedule success in electrical construction. Demonstrating the relationship between the PCP and PE tasks, the findings of this study are expected to help electrical contractors achieve a better performance using effective project management strategies.
Keywords
Electrical constructionProject execution categoriesProject management strategyStatic analysisTasks stringsMATURITY
Identifiers
- Scopus EID
- 2-s2.0-85125786732
- WoS UID
- 000771439900001



Login
Back to Publication list