Skip to content

Statistical analysis of family based dispatching rules and preemption

Document Type
Publications · Journal Article
Registered DB
SCIEScopus
Journal Ranking
JCR Q1Scopus Q1
Citation
Web of Science 5Scopus 5
FWCI (Scopus)
0.23
JCR IF
JCR 2020 7.885
ISSN
0925-5273

Authors

  1. Jing, HaoFirst authorPusan Natl Univ, Sch Business, Dept Business Adm, Busan, South Korea
  2. Sheng, LijuanPusan Natl Univ, Sch Business, Dept Business Adm, Busan, South Korea
  3. Luo, ChaoruiPusan Natl Univ, Sch Business, Dept Business Adm, Busan, South Korea
  4. Kwak, ChoonjongCorresponding authorPusan Natl Univ, Sch Business, Dept Business Adm, Busan, South Korea

Abstract

Family based dispatching rules reduce time spent on setups to improve system performance. However, they can lead to bulky arrivals at subsequent stages, causing additional delays. Few studies have considered this effect so far. Preemption, on the other hand, can enforce the deadlines of important jobs in real situations. This study deals with a new production control problem of family based dispatching rules and preemption. No research has addressed both family based dispatching rules and preemption. A new framework of decision making is presented to solve this problem. The analysis of family based dispatching rules and preemption is carried out at a two-stage flow shop by simulation modeling and statistical analysis to discover several key factors. In addition, this research investigates the performance differences among different preemption types with respect to family based dispatching rules. The results of this paper can offer insight into the use of preemption, especially with family based dispatching rules.

Keywords

SimulationDispatching rulesShop floor controlProduction controlGroup technologyGroup scheduling heuristicsGROUP-TECHNOLOGYSCHEDULING HEURISTICSCONVEYORTIME

Identifiers

Scopus EID
2-s2.0-85111539240
WoS UID
000691268100007