Skip to content

STACK PRE-MARSHALLING PROBLEM: A HEURISTIC-GUIDED BRANCH-AND-BOUND ALGORITHM

Document Type
Publications · Journal Article
Registered DB
SCIEScopus
Journal Ranking
JCR Q4Scopus Q3
Citation
Web of Science 18
JCR IF
JCR 2014 0.396
ISSN
1072-4761

Authors

  1. Zhang, RuiyouFirst authorNortheastern Univ, Coll Informat Sci & Engn, CC
  2. Jiang, Zhong-ZhongNortheastern Univ, Inst Behav & Serv Operat Management, CC
  3. Yun, Won Young부산대학교, 공과대학, 산업공학과, KO

Abstract

The stack pre-marshalling (SPM) problem is a complex combinatorial optimization problem which arises mainly within the field of container logistics. This paper presents a heuristic-guided branch-and-bound (HGB&B) algorithm which can effectively be used to solve the SPM problem. The HGB&B algorithm has a guiding heuristic that cuts 'valueless' branches before the calculation of their bounds improving the search efficiency greatly. The valueless branches cannot result in the optimum solution definitely. Additionally, two heuristics have been designed to generate initial feasible solutions of the problem. Experiments indicate that running time of the algorithm is acceptable if the product of the number and maximum height of stacks is within about 35. The HGB&B algorithm is faster than the existing exact algorithm, and more efficient than a number of sub-optimum algorithms. Therefore, it is applicable and valuable in most real-life scenarios, including container logistics, reducing the time to solve the problem to optimality.

Keywords

branch and boundcombinatorial optimizationcontainer pre-marshallinglogisticsstack pre-marshalling problemCONTAINER RELOCATION PROBLEMTREE-SEARCH PROCEDUREMATHEMATICAL FORMULATIONTERMINALSSTORAGEBLOCKSOPERATIONS

Identifiers

WoS UID
000384668800001